Ningbo Culture Squre Electromechanical Project
The Project consists of water supply and drainage works, electrical works, ventilation and air conditioning works, firefighting works

This project has large quantities, tight construction period and involves many disciplines. In view of its characteristics, the Company gives full play to its strong advantages in personnel, technology, mechanical equipment and construction management, uses advanced construction technology, adopts scientific management and meticulously organizes construction. Fully consider the construction cooperation with civil engineering, decoration engineering and other disciplines. The mechanical and electrical installation shall be carried out in the principle of "main pipe first, then branch pipe". First install some main pipelines in the basement and risers in the tube well, then install horizontal main pipes on each floor, and finally connect the branch pipes after the end equipment is installed.