I. Engineering enclosure setting specification
1. Continuous and closed fences shall be set up around the construction site; safety protection facilities shall also be set up for multi -storey and high -rise buildings. The height of the fence set up in the main sections of the urban area and the city, the airport, the dock, and the station square shall not be less than 2.5m. The fence set on other sections must not be less than 1.8m.
2. The materials used by the enclosure should ensure that the fence is stable, neat and beautiful. The construction site of the municipal engineering project can be set up in accordance with the engineering schedule or the unified continuous guardrail facilities are used in accordance with regulations. The construction unit shall not stack building materials, garbage and engineering residue outside the construction site. In areas approved for temporary occupation, the area of the approved area should be strictly stored in accordance with the approval area and the nature of the use of construction materials or equipment, and the fence higher than 1m should be set around the temporary area.
3. In the conditions of the conditions, the four -week wall, the exterior wall of the dormitory must hang up and write the eye -catching promotional slogans that reflect the spirit of the enterprise and the style of the times.
II. Specific requirements for surgery settings
On the premise of ensuring safety construction and public safety, the "one increase, three decrease, and seven publicity" are fully implemented.
(1) Municipal construction projects are fully implemented "one increase and three decrease".
1. Each construction project is sent by a municipal surrounding supervisor by the Municipal Bureau. Each construction unit determines a municipal enclosure personnel to jointly supervise the implementation of the enclosure and guidance measures during the construction period.
2. Each construction project must arrange the construction cycle of each process scientific, reasonable, and compact to earnestly achieve "three reductions."
The first is to reduce the area area of the processing area. Each construction unit shall calculate the processing and office area of the materials before entering the market. The processing area of the processing area is calculated based on the 10 -day workload.
The second is to reduce the stacking time of the internal materials of the construction fence. In principle, in addition to large and difficult transportation components, the rest of the construction materials must not exceed 10 days.
The third is to reduce the cycle of occupation. Reasonably adjust the sequence of the construction time, avoid concentrated construction, over occupation, and overdue, and ensure that municipal roads are "less occupied, fast, and early."
(2) On the basis of the suspension of construction in accordance with the specifications, each construction project is added to the construction inscription card and special process notice sign. Seven aspects are publicized
I. Regulations for the construction nameplate
(1) The construction nameplate should include: project name, construction unit, construction unit, construction time, completion time, project leader and contact number, municipal supervisor and contact number.
(2) The size of the construction nameplate is: 1.6 meters × 0.9 meters. Municipal engineering construction nameplate uses a blue -bottomed white word. Non -municipal engineering construction nameplate uses a green background. The construction nameplate of emergency and rescue engineering construction is black. (Annex I)
(3) Suspension requirements: The construction site with a length of less than 50 meters, hanging construction permits, engineering overview cards, environmental protection supervision cards at the ends of the construction site; construction sites with a length greater than 50 meters and less than 100 meters. Outside of the license, engineering overview card, and environmental protection supervision cards, a construction inscription card should be hung in the line section; the construction site with a length greater than 100 meters, every 100 meters, add 1 construction inscription card, and so on.
II. Regulations on special processes
(1) Special process publicity systems for various types of roads are implemented. When construction such as road foundation, facade health, pipeline functional tests, and special processes such as welded pipes and underground pipes, special process notice signs need to be suspended.
(2) Special process notes should include: process name, starting time. The size of the production is 0.6 meters × 0.9 meters. The special process of municipal engineering is made of blue -bottomed white characters. The special process of non -municipal excavation projects is made of green background. (Annex II)
(3) Suspension requirements: During the construction of special processes, at least one special process is suspended to inform the license. The construction enclosure length should be hung up by more than 100 meters, and so on.
III. How is the municipal road construction site blocking specifications specified?
1. Municipal construction enclosure and beautification treatment, the surrounding of the construction line is prohibited, and the names, safety, quality, and civilized construction terms are sprayed along the construction of the construction.
2. The municipal construction fence is resettled, and the blocking installation and cooperation with the progress of the project must be completed. It must be completed before the construction of the project, and the basis is based on half of the pavement. The enclosure resettlement should be neat and stable. The position of the resettlement should be continuously closed in except for the principle of preventing road traffic and pedestrians. Assign special personnel to maintain traffic order. The remaining soil, construction materials and other debris are not allowed near the enclosure area, and it is guaranteed to be tidy within this range.
3. Selected materials for municipal construction fence. The construction fence of the construction section is selected as a blue color steel plate. The thickness of the use is not less than 0.45mm. On the road, the welding of the welding of the legs is fixed on the ground to increase the wind stability of the enclosure.
4. Municipal construction enclosure requires construction sites to effectively prevent dust and noise transmission. It is an indispensable safety protection measure at the construction site. However, the section of individual roads will cover the sight of passers -by. Pedestrians and vehicles are quite dangerous. For driving safety at the intersection, the enclosure along the sides of the intersection is 1.5 meters high and 3 meters wide. This is convenient for pedestrians and drivers to clearly see the road conditions and improve construction safety.
5. Other requirements are used around the grooves and foundation pit, and the steel pipes and protective nets are used to encide in, and a safety warning sign is set up with the heart falling, and should not be approached. Set up speed limited tradance and beware of vehicles at the flat crossing port along the line.
6. The enclosure and management and management are managed in accordance with the principle of "who set and who manage". The construction site is arranged for special personnel to maintain the maintenance, keep the enclosure, clean, beautify, and no damage, and remove it after the construction, clean up the construction site, maintain a safe and civilized image, and achieve the standard of civilized construction.
7. Supervision and management of the project department, the project department regularly inspects the surrounding of the construction site, and uses it as an important part of creating a safe and civilized construction site. The construction operation team ordered the stop construction, rectification within a time limit, and punishment in accordance with the corresponding terms.